TENOVA S.P.A – Movable Skids belongs to Slab Furnace 400T/H
Start Date: September 2024
Finish Date: Ongoing
Weight of Equipment: ~65.000 Kg
Explanation: Manufacturing
TENOVA S.P.A – Lifting and Travelling belong to Slab Furnace
Start Date: August 2024
Finish Date: Ongoing
Weight of Equipment: ~189.000 Kg
Explanation: Manufacturing
PERSİCO S.P.A - Frames
Start Date: August 2024
Finish Date:September 2024
Weight of Equipment: ~2.000 Kg
Explanation: Manufacturing
İDÇ AŞ. – RMI
Start Date: April 2024
Finish Date: June 2024
Weight of Equipment: ~4.000 Kg
Explanation: Manufacturing pipes belongs to Raw Material Handling
İZDEMİR ENERJİ AŞ. – Parts
Start Date: April 2024
Finish Date: April 2024
Weight of Equipment: ~5.000 Kg
Explanation: Manufacturing some parts
İDÇ AŞ. – Recuperator
Start Date: March 2024
Finish Date: Ongoing
Weight of Equipment: ~18.000 Kg
Explanation: Manufacturing recuperator belongs to Rolling Mill Furnace
HASÇELİK AŞ. – EAF Water Cooled Panels and Steel Structures
Start Date: January 2024
Finish Date: Ongoing
Weight of Equipment: ~180.000 Kg
Explanation: Manufacturing Water Cooled Panels belong to Electrical Arc Furnace
HASÇELİK AŞ. – CCM Equipment
Start Date: January 2024
Finish Date: Ongoing
Weight of Equipment: ~31.000 Kg
Explanation: Manufacturing Tundish and equipment of CCM
Asil Çelik – Bulged Panel
Start Date: January 2024
Finish Date: February 2024
Weight of Equipment: ~1.500 Kg
Explanation: Manufacturing
KOCAER DEMİR ÇELİK AŞ. – FTP Facility
Start Date: November 2023
Finish Date: January 2024
Weight of Equipment: ~15.000 Kg
Explanation: Manufacture and Erection
TENOVA SPA. – Reheating Furnace Gas, Air and Pilot Burner Piping
Start Date: November 2023
Finish Date: January 2024
Weight of Equipment: ~10.000 Kg
Explanation: Manufacturing gas, air and Pilot burner piping. All welding was 100% UT.
İDÇ AŞ. - Walking Beam Furnace 120 T/H
Start Date: 2002
Finish Date: 2003
Weight of Equipment: 300.000 Kg
Explanation: Manufacturing and erection Rebar Mill Walking Beam Furnace BENDOTTI 120 ton/h.
İDÇ AŞ. – CCM Spray Cooling
Start Date: November 2023
Finish Date: Ongoing
Weight of Equipment: ~1.000 Kg
Explanation: Manufacturing
Asil Çelik – Water Cooled Panels
Start Date: November 2023
Finish Date: Ongoing
Weight of Equipment: ~3.500 Kg
Explanation: Manufacturing
IEM FörderTechnik - Parts
Start Date: November 2023
Finish Date: November 2023
Weight of Equipment: 2 Tons
Explanation: Machined Parts Manufacturing
MHS Srl. – Material Handling System Erection
Start Date: October 2023
Finish Date: Ongoing 2023
Weight of Equipment:
Explanation: Erection activities which belongs to Material Handling System for Steel Making Shop
LISCO (Libyan Iron & Steel Co.) – Upper Shell Panels
Start Date: February 2023
Finish Date: May 2023
Weight of Equipment: ~12.500 Kg
Explanation: Manufacturing
TENOVA Loi – Furnace
Start Date: February 2023
Finish Date: July 2023
Weight of Equipment: ~50.000 Kg
Explanation: Manufacturing
MHS Srl. – Material Handling System Manufacturing
Start Date: February 2023
Finish Date: Ongoing
Weight of Equipment:
Explanation: Manufacturing all parts and erection which belongs to Material Handling System for Steel Making Shop
HASÇELİK AŞ. – MAIR Conditioning Lines
Start Date: February 2023
Finish Date: April 2023
Weight of Equipment: 150 Tons
Explanation: Erection Conditioning Lines
İDÇ AŞ. – Water Cooled Duct
Start Date: December 2022
Finish Date: February 2023
Weight of Equipment: ~25.600 Kg
Explanation: Manufacturing
KOCAER AŞ. - Cooling Bed
Start Date: January 2023
Finish Date: April 2023
Weight of Equipment: Appx. 160 Tons
Explanation: Manufacturing & Erection Medium Section Mill cooling platform
İDÇ AŞ. – Damper
Start Date: November 2022
Finish Date: January 2023
Weight of Equipment: ~1.500 Kg
Explanation: Manufacturing
IEM FörderTechnik - Parts
Start Date: November 2022
Finish Date: January 2023
Weight of Equipment: 3 Tons
Explanation: Machined Parts Manufacturing
ARC – IDÇ AŞ. – WTP Erection
Start Date: May 2022
Finish Date: Ongoing
Weight of Equipment:
Explanation: Manufacturing pipes prefabrication and erection which belongs to the Water Treatment Plant
ARC – IDÇ AŞ. – Scraper
Start Date: December 2022
Finish Date: January 2022
Weight of Equipment: ~3.000 Kg
Explanation: Manufacturing Scraper which belongs to the Wastewater Bunker
Hormozgan Steel Co. (HOSCO) – Lime Plant Valves
Start Date: November 2022
Finish Date: February 2023
Weight of Equipment: 15 Tons
Explanation: 2 Valves (dia1100),1 Valve (DN1000) and Parts (2 pcs. Lever&Shafts Manufacturing)
İDÇ AŞ. – Damper
Start Date: September 2022
Finish Date: November 2022
Weight of Equipment: ~1.500 Kg
Explanation: Manufacturing
GRINDBALLS AŞ. – Mill Piping
Start Date: September 2022
Finish Date: November 2022
Weight of Equipment: 5.000 meters
Explanation: CW Pipe prefabrication and erection
İDÇ AŞ. – Central Ring Panels
Start Date: September 2022
Finish Date: November 2022
Weight of Equipment: ~4.500 Kg
Explanation: Manufacturing
İDÇ AŞ. – Safety Relief Valve (Trading)
Start Date: April 2022
Finish Date: August 2022
Weight of Equipment: ~500 Kg
Explanation: Safety relief valve for Oxygen Plant
ARC – IDÇ AŞ. – Pipes Prefabrication
Start Date: May 2022
Finish Date: August 2022
Weight of Equipment:
Explanation: Manufacturing pipes prefabrication and erection which belongs to the Water Treatment Plant
KOCAER AŞ. - Cyclone
Start Date: June 2022
Finish Date: June 2022
Weight of Equipment: 5 Tons
Explanation: Manufacturing & Erection cyclone for FTP
HASÇELİK AŞ. – NCO Additional Mill Stand
Start Date: June 2022
Finish Date: July 2022
Weight of Equipment: 120 Tons
Explanation: Erection Round Bar Mill Stand
HASÇELİK AŞ. - Cooling Bed
Start Date: May 2022
Finish Date: June 2022
Weight of Equipment: 140 Tons
Explanation: Erection Round Bar cooling platform
ARC – IDÇ AŞ. –Wastewater Bunker (New Investment)
Start Date: May 2022
Finish Date: June 2022
Weight of Equipment: ~27.000 Kg
Explanation: Manufacturing Wastewater Bunker which belongs to the Water Treatment Plant
İDÇ AŞ. – Medium Section Cooling Bed
Start Date: April 2022
Finish Date: June 2022
Weight of Equipment: ~20.000 Kg
Explanation: Manufacturing Medium section cooling platform
KAR-DEMİR AŞ. Furnace Stack
Start Date: February 2022
Finish Date: May 2022
Weight of Equipment: 30 Tons
Explanation: Stack Manufacturing in Workshop
İÇDAŞ AŞ.- Re-Heating Furnace Water Tanks
Start Date: February 2022
Finish Date: May 2022
Weight of Equipment: 16.000 Kg
Explanation: Manufacturing stainless steel water collection ducts for Re-heating Furnace
DANIELI Germany.- Rollbonding Line
Start Date: January 2022
Finish Date: April 2022
Weight of Equipment: 100.000 Kg
Explanation: Rollbonging line which is producing parts to automotive industry. MEIP (Mechanical, Electrical, Instrumentation and Piping erection) and CE certification
İDÇ AŞ. – Scrap Pre-Heating System
Start Date: January 2022
Finish Date: March 2022
Weight of Equipment: ~20.000 Kg
Explanation: Manufacturing Medium section cooling platform
YEŞİLYURT DC.- Wire Rod Mill
Start Date: January 2022
Finish Date: April 2022
Weight of Equipment: 900.000 Kg
Explanation: Wire Rod Mill 500.000 TPY Machinery and Equipment Erection
SARRALLE Spain – Fettling Machine
Start Date: November 2021
Finish Date: February 2022
Weight of Equipment: 6-7 Tons
Explanation: Fettling machine Manufacturing with CE certification
PERSICO SPA. - Parts
Start Date: November 2021
Finish Date: December 2021
Weight of Equipment: 12 Tons
Explanation: Parts Manufacturing in Workshop
ENDEAVOUR LLC. - Parts
Start Date: November 2021
Finish Date: February 2022
Weight of Equipment: 15 Tons
Explanation: 2 Valve (dia1000) and Burner Manufacturing in Workshop
İÇDAŞ AŞ.- Wire Rod Mill
Start Date: November 2021
Finish Date: January 2022
Weight of Equipment: 765.000 Kg
Explanation: Wire Rod Mill 500.000 TPY Machinery and Equipment Erection
ÖZKAN DEMİR ÇELİK AŞ. – BSE Lance Manipulator Piping
Start Date: September 2021
Finish Date: November 2021
Weight of Equipment: ~670 M
Explanation: Prefabricate and erection; DN25 – DN65 CS and SS Oxgen, Water, Air and Hydraulics pipelines of Lance Manipulator
İDÇ AŞ. – Water Cooled Duct
Start Date: September 2021
Finish Date: December 2021
Weight of Equipment: ~22.600 Kg
Explanation: Manufacturing
İDÇ AŞ. – Central Ring Panels
Start Date: September 2021
Finish Date: December 2021
Weight of Equipment: ~4.500 Kg
Explanation: Manufacturing
İÇDAŞ AŞ.- Wire Rod Mill
Start Date: November 2021
Finish Date: January 2022
Weight of Equipment: 765.000 Kg
Explanation: Wire Rod Mill 500.000 TPY Machinery and Equipment Erection
İDÇ AŞ. – Gantry Guard
Start Date: September 2021
Finish Date: December 2021
Weight of Equipment: ~3.000 Kg
Explanation: Manufacturing
İDÇ AŞ. – Ladle Revisions
Start Date: September 2021
Finish Date: November 2021
Weight of Equipment: ~12.000 Kg
Explanation: Manufacturing
İDÇ AŞ. – Lower Shell Transfer Car
Start Date: September 2021
Finish Date: November 2021
Weight of Equipment: ~20.200 Kg
Explanation: Manufacturing
KOCAER DEMİR ÇELİK AŞ. – Galvanizing Facility
Start Date: July 2021
Finish Date: November 2021
Weight of Equipment: ~200.000 Kg
Explanation: Manufacturing and Erection
ÖZKAN DEMİR ÇELİK AŞ. – EAF Cover Cooling Panels
Start Date: July 2021
Finish Date: December 2021
Weight of Equipment: ~9.500 Kg
Explanation: Manufacturing EAF Cover Cooling Panels
İDÇ AŞ. – Travers 280 T Capacity
Start Date: July 2021
Finish Date: September 2021
Weight of Equipment: ~12.000 Kg
Explanation: Manufacturing
ÇEBİTAŞ DEMİR ÇELİK AŞ. – EAF Upper Shell
Start Date: July 2021
Finish Date: September 2021
Weight of Equipment: ~11.500 Kg
Explanation: Manufacturing
KOCAER DEMİR ÇELİK AŞ. – FTP Facility
Start Date: June 2021
Finish Date: August 2021
Weight of Equipment: ~18.000 Kg
Explanation: Manufacture and Erection
AKSA ENERJİ AŞ. – Lifting Frames
Start Date: June 2021
Finish Date: July 2021
Weight of Equipment: ~98.000 Kg
Explanation: Manufacturing and Engineering
AKDEMİR AŞ – Steel Structural Reinforcement
Start Date: June 2021
Finish Date: Ongoing
Weight of Equipment: ~50.000 Kg
Explanation: Manufacturing and Erection
AKDEMİR AŞ – Rolling Mill Bend
Start Date: May 2021
Finish Date: May 2021
Weight of Equipment: ~5.000 Kg
Explanation: Manufacturing
HK SEYTAŞ LTD. – Power Plant Dismantling
Start Date: April 2021
Finish Date: May 2021
Weight of Equipment: ~750.000 Kg
Explanation: Dismantling
AKDEMİR AŞ – Recuperator (Waste Heat Exchanger)
Start Date: February 2021
Finish Date: April 2021
Weight of Equipment: ~15.000 Kg
Explanation: Manufacturing and Erection
AKDEMİR AŞ – Roll Way
Start Date: March 2021
Finish Date: March 2021
Weight of Equipment: ~3.000 Kg
Explanation: Manufacturing
AKDEMİR AŞ – Roll Way
Start Date: December 2020
Finish Date: December 2020
Weight of Equipment: ~5.000 Kg
Explanation: Manufacturing
İDÇ AŞ. – Ducts
Start Date: July 2020
Finish Date: September 2020
Weight of Equipment: ~12.000 Kg
Explanation: Manufacture and Erection of Ducts belongs to FTP Unit
DANIELI SPA. – EAF Oxygen Pipe Skid with CE certification
Start Date: July 2020
Finish Date: September 2020
Explanation: Manufacture and Erection of EAF Oxygen Pipe Skid and CE certification
İDÇ AŞ. – Overhead Crane
Start Date: July 2020
Finish Date: September 2020
Weight of Equipment: ~15.000 Kg
Explanation: Manufacture and Erection of overhead crane which has10 tons of lifting
İDÇ AŞ. – Scrap Bucket
Start Date: July 2020
Finish Date: September 2020
Weight of Equipment: ~66.000 Kg
Explanation: Manufacturing and installation scrap bucket
İDÇ AŞ. – Shaft with Lever, Walking Beam Unit
Start Date: June 2020
Finish Date: June 2020
Weight of Equipment: ~4.000 Kg
Explanation: Manufacturing Shaft with lever belongs to Billet Cooling Bed
İDÇ AŞ. – EAF Upper Shell Water Cooling Panels
Start Date: January 2020
Finish Date: March 2020
Weight of Equipment: ~7.000 Kg
Explanation: Manufacturing Water Cooling Panels
İDÇ AŞ. – CCM Steam Suction Ducts
Start Date: January 2020
Finish Date: February 2020
Weight of Equipment: ~2.000 Kg
Explanation: Manufacturing CCM Steam Suction Ducts
AKDEMİR AŞ. – Bar Mill Revamping
Start Date: July 2019
Finish Date: February 2020
Weight of Equipment: 2.750 Tons
Explanation: Bar Mill Machinery Erection and All facility Piping
AKDEMİR AŞ – Furnace Combustion Air Ducts
Start Date: December 2019
Finish Date: January 2020
Weight of Equipment: ~15.000 Kg
Explanation: Manufacturing pusher type Furnace Combustion Air Ducts
AKDEMİR AŞ – Steel Structure of Roof lamp room
Start Date: July 2019
Finish Date: January 2020
Weight of Equipment: ~30.000 Kg
Explanation: Manufacturing and installation Lamp room Steel Structure
AKDEMİR AŞ – Steel Structure
Start Date: July 2019
Finish Date: January 2020
Weight of Equipment: ~80.000 Kg
Explanation: Manufacturing Condenser Connection Steel Structure
ALOSBİ – Steel Structure
Start Date: October 2019
Finish Date: January 2020
Weight of Equipment: ~30.000 Kg
Explanation: Manufacturing and erection administration building roof Steel Structure
İDÇ AŞ. – Water Cooled Panels EAF.
Start Date: January 2020
Finish Date: February 2020
Weight of Equipment: ~10.000 Kg
Explanation: Manufacturing water Cooled Panels EAF.
HOR. STEEL CO. – Mechanic Parts
Start Date: November 2019
Finish Date: January 2020
Weight of Equipment: ~6.500 kg
Explanation: Mechanical Parts Manufacturing in Workshop
İDÇ AŞ. – Rotational Type Billet Exit CCM Platform Area
Start Date: November 2019
Finish Date: December 2019
Weight of Equipment: ~5.500 Kg
Explanation: Manufacturing Rotational Type Billet Exit Area belongs to Billet Cooling Bed
İDÇ AŞ. – Cross Transfer Water Cooled Beam
Start Date: November 2019
Finish Date: November 2019
Weight of Equipment: ~12.000 Kg
Explanation: Manufacturing Water Cooled Beam belongs to Ladle Car
AKDEMİR AŞ. – Overhead Crane
Start Date: September 2019
Finish Date: November 2019
Explanation: Manufacture and Erection of overhead crane which has10 tons of lifting
İDÇ AŞ. – Steel Structure
Start Date: October 2019
Finish Date: October 2019
Weight of Equipment: 14.000 Kg
Explanation: Manufacturing Condenser Connection Steel Structure
HOR. STEEL CO. – Mechanic Parts
Start Date: June 2019
Finish Date: July 2019
Weight of Equipment: ~6.500 kg
Explanation: Mechanical Parts Manufacturing in Workshop
KAR-DEMİR AŞ. - Medium Section Mill
Start Date: May 2018
Finish Date: April 2019
Weight of Equipment: 2.750 Tons
Explanation: Medium Section Mill Machinery Erection
KAR-DEMİR AŞ. & RTI - Walking Hearth Furnace 80 T/H
Start Date: May 2018
Finish Date: June 2019
Weight of Equipment: 600 Tons
Explanation: Walking hearth Furnace 80 T/H erection
HASÇELİK AŞ. - Walking Hearth Furnace 80 T/H
Start Date: November 2018
Finish Date: December 2018
Weight of Equipment: 11 Tons
Explanation: Walking Hearth Furnace Equip. (SS Water Tanks) Manufacturing in Workshop and Site erection
KAR-DEMİR AŞ. & RTI - Walking Hearth Furnace 80 T/H
Start Date: June 2018
Finish Date: November 2018
Weight of Equipment: 120 Tons
Explanation: FIVESTEIN - Walking hearth Furnace 80 T/H Equipments (Hot Air Ducts – Waste Gas Ducts – Stack 56M) Manufacturing in Workshop
ÖZKAN DEMİR ÇELİK AŞ. – Meltshop
Start Date: September 2018
Finish Date: November 2018
Meter of Pipe: 560 m
Explanation: Manufacturing and erection; Ø 1/2" - 4" CS and SS hydraulics pipelines of EAF, LF, CCM. Ø 1/2" – 12" CS and SS cooling water pipelines of EAF, LF, CCM.
HASÇELİK AŞ. - Walking Hearth Furnace 80 T/H
Start Date: September 2018
Finish Date: November 2018
Weight of Equipment: 10 Tons
Explanation: Walking Heart Furnace Equipments (Waste Gas Duts – Recuparator Case) Manufacturing in Workshop
ASMAŞ AŞ. & İÇDAŞ AŞ. - Walking Hearth Furnace 120 T/H
Start Date: June 2018
Finish Date: July 2018
Weight of Equipment: 55 Tons
Explanation: Walking hearth Furnace 120 T/H Combustion Air Pipes equipment manufacturing
ASMAŞ AŞ. & IOB (Industrie-Ofen-Bau GmbH) – HTF (Heat Treatment Furnace)
Start Date: June 2018
Finish Date: July 2018
Weight of Equipment: 12 Tons
Explanation: Burner for Heat Treatment Furnace Manufacturing in Workshop
HABAŞ AŞ. - Alignment
Start Date: May 2018
Finish Date: June 2018
Weight of Equipment: ~1.500 Meters
Explanation: Overhead Crane rail alignment
İÇDAŞ AŞ.- BAR MILL
Start Date: April 2018
Finish Date: August 2018
Weight of Equipment: 3.100 Tons
Explanation: Bar Mill 1.000.000 TPY Machinery and Equipment Erection
ASMAŞ AŞ. - IOB (Industrie-Ofen-Bau GmbH)
Start Date: April 2018
Finish Date: June 2018
Weight of Equipment: 50 Tons
Explanation: Heat Treatment Furnace Manufacturing in Workshop
İÇDAŞ AŞ.- Walking Hearth Furnace 120 T/H
Start Date: April 2018
Finish Date: July 2018
Weight of Equipment: 250 Tons
Explanation: Walking Hearth Furnace 120 T/H Equipments (SS Water Tanks and Hoppers - Fixed hearth - Covering Plates – Waste Gas Ducts) Manufacturing in Workshop
TSGI - STAR REFINERY.
Start Date: April 2018
Finish Date: April 2018
Explanation: Retro Jetting
TSGI - STAR REFINERY.
Start Date: March 2018
Finish Date: April 2018
Explanation: Retro Jetting
ÖZKAN DEMİR ÇELİK AŞ. – General Piping
Start Date: January 2018
Finish Date: March 2018
Meter of Pipe: 1.100 m
Explanation: Manufacturing and erection Ø 8" water pipelines of WTP.
HABAŞ AŞ. - HSP (Hot Skin Pass) Unit
Start Date: September 2017
Finish Date: December 2017
Weight of Equipment: 6.500 meters
Explanation: HABAŞ AŞ. Hot Strip Mill - Hot Skin Pass Unit from SMS 6.500 meters carbon steel and stainless-steel hydraulic pipelines (TIG welding) ø16-114 mm. Manufacture and assembly.
KOCAER AŞ. - Piping
Start Date: May 2017
Finish Date: July 2017
Weight of Equipment: 410 tons
Explanation: Air piping of A3 Facility
KOCAER AŞ. - Piping
Start Date: May 2017
Finish Date: July 2017
Weight of Equipment: 410 tons
Explanation: Grease oil piping of A3 Facility
KOCAER AŞ. – Steel Construction
Start Date: April 2017
Finish Date: July 2017
Weight of Equipment: 410 tons
Explanation: Manufacturing steel construction of A3 Facility
DANIELI MECCANICHE SPA. - Assistance
Start Date: April 2017
Finish Date: November 2017
Explanation: Assistance for Commissioning of Plant
DANIELI MECCANICHE SPA. - MeltShop (RMH, EAF, LF, VD)
Start Date: April 2017
Finish Date: August 2017
Weight of Equipment: ˜2500 tons
Explanation: Completion of Plant MKE – MeltShop (RMH, EAF, LF, VD) MEIP (mechanical, electrical, instrumentation, piping) erection
DANIELI MECCANICHE SPA. - FTP (Fume Treatment Plant)
Start Date: April 2017
Finish Date: August 2017
Weight of Equipment: ˜2500 tons
Explanation: Completion of Plant MKE – FTP (Fume Treatment Plant) MEIP (mechanical, electrical, instrumentation, piping) erection
DANIELI MECCANICHE SPA. – HVAC (Heating, Ventilating and Air Conditioning)
Start Date: Feb 2017
Finish Date: June 2017
Weight of Equipment: -
Explanation: HVAC (Heating, Ventilating and Air Conditioning erection of MKE Meltshop)
DANIELI MECCANICHE SPA. - ICM (Ingot Casting Machine)
Start Date: January 2017
Finish Date: Mach 2017
Weight of Equipment: 225 tons
Explanation: Ingot Casting Mach. MEIP (mechanical, electrical, instrumentation, piping) erection
İDÇ AŞ. – Scap Bucket
Start Date: January 2017
Finish Date: February 2017
Weight of Equipment: 21.000 Kg
Explanation: Manufacturing Scarp Bucket
TOSYALI-TOYO AŞ. – BAF (Batch Annealing Furnace)
Start Date: April 2016
Finish Date: August 2016
Weight of Equipment: 410 tons
Explanation: Manufacturing steel construction of equipment for BAF and Entry Section
TOSYALI-TOYO AŞ. – CAL (Continuous Annealing Line) FURNACE
Start Date: April 2016
Finish Date: August 2016
Weight of Equipment: 585 tons
Explanation: Manufacturing steel construction of equipment for CAL Furnace Section
SASA AŞ.
Start Date: April 2016
Finish Date: August 2016
Weight of Equipment: 20 tons
Explanation: Erection and manufacturing steel structure of SSP Polyester Facility
SASA AŞ.
Start Date: April 2016
Finish Date: August 2016
Weight of Equipment: 1250 tons
Explanation: mechanical equipments erection of SSP Polyester Facility
SASA AŞ.
Start Date: April 2016
Finish Date: August 2016
Weight of Equipment: 5.000 meters
Explanation: Piping manufacturing and erection of SSP Polyester Facility
İDÇ AŞ. – Scap Bucket
Start Date: March 2016
Finish Date: April 2016
Weight of Equipment: 10.000 Kg
Explanation: Manufacturing Scarp Bucket
TOSYALI-TOYO AŞ. -ETL (Electroliquid Tining Line)
Start Date: November 2015
Finish Date: April 2016
Weight of Equipment: 980 tons
Explanation: Manufacturing steel construction of equipment for ETL (Electroliquid Tining Line)
SMS GROUP GMBH – PPL UNIT
Start Date: July 2015
Finish Date: August 2015
Weight of Equipment: 1737 meters
Explanation: HABAŞ AŞ. Hot Strip Mill Project PPL Unit 1.737 meters carbon steel hydraulic pipelines (TIG welding) ø16-48 mm. Disassembly – manufacture and assembly.
HABAŞ AŞ. - Natural Gas Power Plant
Start Date: March 2015
Finish Date: March 2016
Weight of Equipment: 360 tons
Explanation: Manufacturing and Erection high-pressure boiler of natural gas power plant.
TOSÇELİK AŞ. - Steel Construction
Start Date: June 2015
Finish Date: August 2015
Weight of Equipment: 1.250 tons
Explanation: 1.250 tons Steel Structure manufacturing and assembly
İDÇ AŞ. – Scap Bucket
Start Date: February 2015
Finish Date: March 2015
Weight of Equipment: 10.000 Kg
Explanation: Manufacturing Scarp Bucket
İDÇ AŞ – Fume Treatment Plant
Start Date: October 2014
Finish Date: January 2015
Weight of Equipment: 420.072 Kg
Explanation: Manufacturing and Erection of İDÇ dust collection facility steel construction, trombone pipes, intake channel and exit channel of the trombone pipes, air cooling pipes, intake and exit hoopers and bunkers were made.
ÖZKAN DEMİR ÇELİK AŞ. - Lime Feed Unit Pipelines
Start Date: October 2014
Finish Date: November 2014
Meter of Pipe: 830 m
Explanation: Manufacturing and Erection of Ø 1/2" - 4" carbon steel and stainless - lime pipelines, nitrogen pipelines and air pipelines of lime feeding unit.
TOSÇELİK AŞ. - Bar Mill
Start Date: September 2014
Finish Date: November 2014
Weight of Equipment: 1.101 tons
Explanation: 1.101 tons Rolling mill machine erection
TOSÇELİK AŞ. - Bar Mill
Start Date: September 2014
Finish Date: November 2014
Explanation: Manufacturing and Erection of 14.665 meters long pipes between DN10 … DN500 diameter range on Air and Water Lines were completed. Argon welding was used for DN100 and lower diameter ones. Electric welding was implemented for the ones of which diameter is more than DN100. Manufacturing and Erection of 1,544 meters long stainless pipe between Ø22 ...Ø168 diameter range on hydraulic, lubrication and grease and of 3.920 meters long grease line were completed. Argon welding was used in all the lines. Our firm made all pickling and flushing.
Yolbulan Baştuğ &CVS - Walking Heart Furnace
Start Date: June 2014
Finish Date: July 2014
Explanation: Pipeline Isolation of Ø200...Ø900 combustion air pipes was made. The exterior surface of isolated pipes is 1.017 square meter.
TOSÇELİK AŞ. - Walking Heart Furnace
Start Date: April 2014
Finish Date: May 2014
Explanation: The isolation works of Ø325 ...Ø920 diameter, 5 mm thick combustion air pipes and of approximately 3,000 meters of evaporative cooling water line are made. The exterior surface of isolated pipes is 1.200 square meters.
Yolbulan Baştuğ & CVS - Bar Mill
Start Date: March 2014
Finish Date: August 2014
Weight of Equipment: 2.370 tons
Explanation: 2.370 tons machine erection.
Yolbulan Baştuğ & CVS - Walking Heart Furnace
Start Date: March 2014
Finish Date: June 2014
Weight of Equipment: 455 tons
Explanation: FIVES Walking Heart Furnace Erection.
Yolbulan Baştuğ & CVS – Walking Heart Furnace
Start Date: March 2014
Finish Date: June 2014
Explanation: Combustion Air Pipes, Gas Channel and Chimney Manufacturing and Erection of Ø200 ... Ø900 diameter combustion air and the manufacturing and Erection of 2.779 meters cooling water were completed.
HABAŞ AŞ. - Hot Strip Mill Plant
Start Date: March 2014
Finish Date: June 2014
Explanation: Slab Heating Furnace Combustion Air Pipes Manufacture, erection, and Insulation of totally 6000 m2 Ø 114 - Ø 3020 combustion air pipelines Hot Strip Mill heating furnace.
TOSÇELİK AŞ. - Wire Rod Mill
Start Date: February 2014
Finish Date: June 2014
Weight of Equipment: 2.755 tons
Explanation: 2.755 tons of machines erection.
TOSÇELİK AŞ. - Wire Rod Mill
Start Date: February 2014
Finish Date: April 2014
Explanation: Manufacturing and Erection of 14,665-meters long pipes between DN10 … DN700 diameter range on Air and Water Lines were completed. Argon welding was used for DN100 and lower diameter ones. Electric welding was implemented for the ones of which diameter is more than DN100. Manufacturing and Erection of 8,924 meters long stainless pipe between Ø6 ...Ø325 diameter range on hydraulic, lubrication and grease and of 706-meter-long seamless steel pipe were completed. Argon welding was used in all the lines. Our firm made all pickling and flushing.
TOSÇELİK AŞ. - Wire Rod Mill
Start Date: February 2014
Finish Date: April 2014
Explanation: Manufacturing and assembly of 258 anchors and embedded steel was completed upon the demand of TOSÇELİK for manufacturing and Erection because of the reason that the construction firm lags in anchors and embedded steel work.
TOSÇELİK AŞ. - Walking Hearth Furnace 180T/H
Start Date: February 2014
Finish Date: April 2014
Explanation: Combustion Air Pipes, Gas Channel and Chimney manufacturing and Erection of Ø325 ......Ø920 diameter, 5 mm thick combustion air pipelines and the manufacturing and Erection of approximately 3,000 meters of evaporative cooling water line are made. Argon welding was used in the entire evaporative cooling water line.
TOSÇELİK AŞ. - Walking Hearth Furnace 180T/H
Start Date: January 2014
Finish Date: April 2014
Weight of Equipment: 506 tons
Explanation: 506 tons of furnaces equipment erection.
IDC AŞ - Steel Construction
Start Date: January2014
Finish Date: August 2014
Weight of Equipment: 672.327 Kg
Explanation: Manufacturing and erection of steel construction stock warehouse
İDÇ AŞ. – Scap Bucket
Start Date: January 2014
Finish Date: February 2014
Weight of Equipment: 10.000 Kg
Explanation: Manufacturing Scarp Bucket
EGEDEMİR AŞ. - Melthop
Start Date: January 2014
Finish Date: April 2014
Meter of Pipe: 3.287 m
Explanation: Manufacturing and erection of EAF equipment, auxiliary plants, WTP, continuing units and all the Ø 1/2" - 28" carbon steel, stainless and galvanize cooling water, hydraulic lubrication, carbon, oxygen, air, argon, nitrogen pipelines
EGEDEMİR AŞ. – Induction Furnace
Start Date: January 2014
Finish Date: April 2014
Weight of Equipment: 77.974 kg
Explanation: Erection of 8MV, 15 tons capacity induction furnaces (2 qty.)
EGEDEMİR AŞ. - Steel Plant Dust Collecting Unit
Start Date: January 2014
Finish Date: April 2014
Weight of Equipment: 66.870 kg
Explanation: Adjustment and erection of dust collection facility
EGEDEMİR AŞ. – Steel Plant Cooling Tower
Start Date: January 2014
Finish Date: April 2014
Weight of Equipment: 10.000 kg
Explanation: Fine adjustment and erection of HMP 16x16 modular cooling tower
HABAŞ AŞ. - Hot Strip Mill Plant
Start Date: December 2013
Finish Date: March 2014
Meter of Pipe: 15.663 m
Explanation: Manufacturing, mechanical erection and piping, CTL, ESL, Packaging, PPL Units, Ø 8 - 12" carbon steel and stainless cooling water, air and hydraulic lines of Hot Strip Mill Plant.
FEMATEK AŞ. - Cooling Platform
Start Date: March 2013
Finish Date: April 2013
Measure of Equipment: 84 m x 10 m
Explanation: Pre – Assembly of cooling platform for Danielli
ÖZKAN DEMİR ÇELİK AŞ. – VOD (Vacum Dedusting)
Start Date: February 2013
Finish Date: March 2013
Meter of Pipe: 2.600 m
Explanation: Manufacturing and erection of Ø 1/4" - 6" carbon steel and stainless oxygen, nitrogen, argon and hydraulic lubrication pipes of vacuum unit in steel mill plant.
İDÇ AŞ. - Steel Construction
Start Date: January 2013
Finish Date: June 2013
Weight of Equipment: 340.433 Kg
Explanation: Manufacturing and erection of İDÇ Medium Section Mill stock Hall
İDÇ AŞ. – Scap Bucket
Start Date: January 2013
Finish Date: February 2013
Weight of Equipment: 10.000 Kg
Explanation: Manufacturing Scarp Bucket
AKDEMİR AŞ. - Recuperator
Start Date: April 2012
Finish Date: June 2012
Weight of Equipment: 11.661 Kg
Explanation: Pre-Heating Furnace - Recuparator Manufacturing and erection
İDÇ AŞ. - Walking Beam Furnace 80 T/H
Start Date: April 2012
Finish Date: August 2012
Weight of Equipment: 205.545 Kg
Explanation: Manufacturing and erection Walking Beam Furnace FIVESTEIN 80 ton/h capacity.
İDÇ AŞ. - Walking Beam Furnace 80 T/H
Start Date: April 2012
Finish Date: August 2012
Weight of Equipment: 35.000 Kg
Explanation: Manufacturing and erection Medium Section Mill Walking Beam Furnace FIVESTEIN 80 ton/h capacity of the DN 900 – 1200 diameter combustion air pipes
İDÇ AŞ. - Walking Beam Furnace 80 T/H
Start Date: April 2012
Finish Date: August 2012
Weight of Equipment: 40.000 Kg
Explanation: Manufacturing and erection Medium Section Mill Walking Beam Furnace FIVESTEIN 80 ton/h capacity of the 2.000*2.000 mm dimensioned 33.000 mm long waste gas flues and of the 1,876 mm diameter 50.000 mm heighted funnel were completed.
İDÇ AŞ. - Walking Beam Furnace 80 T/H
Start Date: April 2012
Finish Date: August 2012
Weight of Equipment: 65.000 Kg
Explanation: Manufacturing and erection Medium Section Mill Walking Beam Furnace FIVESTEIN 80 ton/h capacity of the 1.876 mm diameter 50 m heighted Stack.
AKDEMİR AŞ. - Recuperator
Start Date: January 2010
Finish Date: March 2010
Weight of Equipment: 11.661 Kg
Explanation: Pre-Heating Furnace - Recuparator Manufacturing and Erection
ÖZKAN DEMİR ÇELİK AŞ. - Meltshop
Start Date: September 2009
Finish Date: October 2010
Meter of Pipe: 10.000 m
Explanation: Manufacturing and Erection of Ø 1/2" - 28" carbon steel, stainless and galvanized pipelines in Meltshop (Scrap Yard, EAF, LF, CCM, Billet Cooling Bed)
ÖZKAN DEMİR ÇELİK AŞ. - Meltshop
Start Date: September 2009
Finish Date: October 2010
Weight of Equipment: 400 tons
Explanation: Machine erection of Meltshop (Scrap Yard, EAF, LF, CCM, Billet Cooling Bed)
ÖZKAN DEMİR ÇELİK AŞ. – WTP (Water Treatment Plant)
Start Date: September 2009
Finish Date: October 2010
Meter of Pipe: 18.000 m
Explanation: Manufacturing and erection of Ø 1/2" - 28" carbon steel, stainless and galvanized cooling water pipelines
ÖZKAN DEMİR ÇELİK AŞ. – WTP (Water Treatment Plant)
Start Date: September 2009
Finish Date: October 2010
Weight of Equipment: 100 tons
Explanation: Machine and equipment erection of WTP
ÖZKAN DEMİR ÇELİK AŞ. – OGP (Oxygen Gas Plant)
Start Date: September 2009
Finish Date: October 2010
Meter of Pipe: 15.000 m
Explanation: Manufacturing and erection of Ø 1/2" - 28" carbon steel, stainless and galvanized oxygen, argon and nitrogen pipelines
ÖZKAN DEMİR ÇELİK AŞ. – OGP (Oxygen Gas Plant)
Start Date: September 2009
Finish Date: October 2010
Weight of Equipment: 350 tons
Explanation: Machine and equipment erection of OGP
ÇEBİTAŞ AŞ. - Walking Hearth Furnace
Start Date: June 2009
Finish Date: July 2009
Explanation: Manufacture and erection Insulation of Ø200 - Ø1750 combustion air and totally 1500 m2 combustion air pipes between Ø200 and Ø1750 heating furnace were made.
ÇEBİTAŞ AŞ. - Walking Hearth Furnace
Start Date: January 2009
Finish Date: June 2009
Meter of Pipe: 5.500 m
Explanation: Manufacture and erection of Ø10 - 12" carbon steel and stainless steel cooling water, air, gas and hydraulic lines of newly – found heating furnace were made.
AKDEMİR AŞ. – Overhead Crane
Start Date: September 2008
Finish Date: November 2008
Explanation: Manufacture and Erection of overhead crane which has10 tons of lifting References: Semih Uysal (AKDEMİR Factory Manager)
ÇEBİTAŞ AŞ. - Auxiliary Plants
Start Date: April 2008
Finish Date: August 2008
Meter of Pipe: 6.250 m
Explanation: Manufacture and Erection of 1/2" - 16" carbon steel and stainless cooling water, oxygen and air pipelines were made.
KOCAER AŞ. - General Pipelines
Start Date: May 2008
Finish Date: December 2008
Meter of Pipe: 12.350 m
Explanation: Manufacturing&erection of 1/2" - 20" carbon steel and stainless cooling water, air, gas lines between heating furnace and packaging units and in auxiliary facilities.
KOCAER AŞ. - Heating Furnace
Start Date: May 2008
Finish Date: June 2008
Explanation: Manufacturing&erection of totally 1.150-m2 isolation of heating furnace gas pipelines.
ÇEBİTAŞ AŞ. - Steel Construction
Start Date: June 2007
Finish Date: December 2007
Weight of Equipment: 150.000 kg
Explanation: Manufacture and erection steel construction of Rolling Mill, column and crane beam of the second Rolling Mill plant.
KOCAER AŞ. - Heating Furnace
Start Date: June 2007
Finish Date: June 2007
Meter of Pipe: 8.000 m
Explanation: Manufacturing and erection of 1/2" -24" cs. and ss. cooling water and gas lines.
ÇEBİTAŞ AŞ. - Rolling Mill Plant
Start Date: June 2006
Finish Date: February 2007
Meter of Pipe: 9.500 m
Explanation: Manufacture and erection of Ø 8 - 24" carbon steel, all the stainless and galvanize cooling water, oxygen, air, argon, nitrogen and grease lines of rolling mill plant.
HABAŞ AŞ. - Oxygen Plant
Start Date: May 2006
Finish Date: August 2006
Meter of Pipe: 1.500 m
Explanation: Manufacturing and erection of 2" - 36" carbon steel carbon-dioxide gas belonging to the oxygen facility lines
HABAŞ AŞ. - Oxygen Plant
Start Date: September 2006
Finish Date: November 2006
Meter of Pipe: 1.300 m
Explanation: Manufacturing and erection Cooling Water Pipelines of oxygen facility, 6 annealing tanks and 4" - 6" water lines of these tanks were completed.
ÇEBİTAŞ AŞ. - Steel Mill Plant
Start Date: August 2005
Finish Date: April 2005
Meter of Pipe: 16.000 m
Explanation: Manufacture and erection of Ø 6 - 24" carbon steel, all the stainless and galvanize cooling water, oxygen, air, argon, nitrogen and grease lines of steel mill plant
HABAŞ AŞ. - Natural Gas Power Plant Start Date: March 2005
Finish Date: August 2005
Meter of Pipe: 3.250 m
Explanation: Manufacturing and erection Pressure Boiler and
Pipelines (1/2" - 16" carbon steel and stainless 100% radiographic - tested and cooling water lines) of newly established natural gas energy plant.
EGEÇELİK AŞ. – CCM (Continuous Casting Machine)
Start Date: May 2005
Finish Date: July 2005
Meter of Pipe: 9.000 m
Explanation: Manufacture and erection Ø 16 - 6" carbon and stainless steel cooling water and hydraulic lines of newly – established 4. CCM unit